It's Mostly A Conservatory. Mostly.
posted by Jaitu at 15:47
After the aforementioned delay the chaps turned up last Wednesday and
set to work on erecting the uPVC framework and glazing. By all accounts
they worked pretty tirelessly until Friday and now have the majority of
a conservatory in place.
All that's left to do is:
Lay the screed floor.
Tile the screed floor.
Wire the sockets and ceiling lights.
Relocate the formerly outdoor tap to the new outdoors.
Remove the botched dryer vent.
Make good the botched dryer vent.
Fit a new dryer vent.
Plaster the walls.
Fix and secure the new roof water down pipe.
Not in that order but I think that's it.
set to work on erecting the uPVC framework and glazing. By all accounts
they worked pretty tirelessly until Friday and now have the majority of
a conservatory in place.
All that's left to do is:
Lay the screed floor.
Tile the screed floor.
Wire the sockets and ceiling lights.
Relocate the formerly outdoor tap to the new outdoors.
Remove the botched dryer vent.
Make good the botched dryer vent.
Fit a new dryer vent.
Plaster the walls.
Fix and secure the new roof water down pipe.
Not in that order but I think that's it.
It really is a pity that this has been such a nightmare. The product
that Nuglas supply (the actual uPVC and glazing) is great, the fitting
that they themselves do is faultless. Unfortunately the unending delays
and poor communication as well as some of the sub-contracted work mean
there is no way we could ever recommend them.
Labels: Conservatory, Home, Jaitu