Re-Decontinues
posted by Jaitu at 23:53
Keeping with the general spirit of cleaning, clearing, sorting and rejuvenating I decided it was well past time that the site had another face lift. So here is the result. A cleaner, hopefully improved and enlarged space.
On the more tangible front the conservatory is now nearly done. We had most of the tiles laid this week. Embarrassingly we ran short by about four tiles, the first delay of our own making and so near the finish. We were able to buy more but following the trend we were promised a phone call on Wednesday to arrange another visit and have not yet heard anything more despite leaving messages and having Nuglas chase it up.
The pipe work has been boxed in and once the final tiles are down we need only have skirting and final fixings applied.
The spot lights flicker when the dimmer is in use but we should be able to get that rectified easily enough too.
Then it only remains for us to paint the plaster, move in the tumble dryer and build an enclosure for it, then get some furniture and we're completed. It will be an enormous relief when it's over.
After that we have plans to get the garden respectable, move and replace a couple of radiators and then completely redecorate our bedroom. The fun just never stops.
On the more tangible front the conservatory is now nearly done. We had most of the tiles laid this week. Embarrassingly we ran short by about four tiles, the first delay of our own making and so near the finish. We were able to buy more but following the trend we were promised a phone call on Wednesday to arrange another visit and have not yet heard anything more despite leaving messages and having Nuglas chase it up.
The pipe work has been boxed in and once the final tiles are down we need only have skirting and final fixings applied.
The spot lights flicker when the dimmer is in use but we should be able to get that rectified easily enough too.
Then it only remains for us to paint the plaster, move in the tumble dryer and build an enclosure for it, then get some furniture and we're completed. It will be an enormous relief when it's over.
After that we have plans to get the garden respectable, move and replace a couple of radiators and then completely redecorate our bedroom. The fun just never stops.
Labels: Conservatory, Home, Jaitu, Site


0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home